SUNGO Energy Technology RSDi-2 2-in-1 Rapid Shutdown Devices Data Gateway

Specifikacije
- Product Name: 2-in-1 Rapid Shutdown Devices SUNGO RSDi-2 &
Data Gateway SUNGO GTC - Rapid Shutdown Devices Model: SUNGO RSDi-2
- Data Gateway Model: SUNGO GTC
- Delovna zvezatage: AC90-264V
- Maximum RSDi-2 Units per GTC: 50
- GTC Waterproof Rating: IP67
Konec izdelkaview
The SUNGO RSDi-2 is a rapid shutdown device with data monitoring capabilities that works in conjunction with the SUNGO GTC data gateway. It provides module-level rapid shutdown functionality and monitors the operating parameters of PV modules. Document version: SUNGO-RSDi-2>CIM-V1-2024 EN Release Date: 2024.7
Konec izdelkaview
2-in-l Rapid Shutdown Devices SUNGO RSDi-2
Data Gateway SUNGO GTC
The SUNGO RSDi-2 is a rapid shutdown with data monitoring, matching the data gateway GTC, with a module-level rapid shutdown function that monitors the operating parameters of the PV modules and reports the operating status of the PV modules.

Diagram povezave
SUNGO RSDi-2 Product Installation
- Install the RSDi-2 by snapping the RSDi-2 upward onto the PV module frame

- Connect IN+ and IN- of RSDi-2 to the positive and negative terminals of the first and second PV module junction boxes respectively, and so on.

- Connect two adjacent RSDi-2 output ports in series and then connect them near to the inverters with a homemade DC extension cable.

SUNGO GTC Installation
- Step 1. Data gateway connectivity
- Install the GTC near the inverter.
- Connect the OUT+ of the last rapid shutdown to the PV+ of the inverter.
- Connect the OUT- of the first rapid shutdown through the magnetic ring of the GTC to the PV- of the inverter.
- After confirming that the connection is correct GTC connects the MCB and then connects it to the AC.
The GTC itself is IP67 waterproof and can be used without a distribution cabinet.
Vhodna linija za izmenični tok je priključena na izmenično napajanje z vodoodpornim konektorjem L16-2.
- Preverite, ali so konstrukcijski nosilci varno pritrjeni in ali so vsi vijaki priviti.
- Check that all cables are connected with the correct polarity and that the connections are firm and reliable to ensure that there are no short circuits.
- Confirm that the system is connected correctly, the inverter DC switch is ON, and the inverter is turned on.
Opomba: one GTC can take up to 50 RSDi-2.
- 2. korak
- Connecting the data gateway to a power source Connect the data gateway to 90-264V AC power supply. Ensure that the power indicator green light is always on, and the running indicator green light is also always on. Check whether the inverter is working normally.
- 3. korak. Prikaz statusa splošnih pogojev poslovanja

Opomba: Stanje indikatorja kaže

- Step 4. GTC Entry Rapid Shutdown Device
- The GTC needs to enter the address of the rapid shutdown devices it manages, otherwise it can’t communicate and upload the rapid shutdown device’s data normally. There are two ways to enter rapid shutdown devices: automatic and manual. When there is only one GTC in the field, you can use the automatic, but if there are more than one GTC in the field, you must execute the manual.
Auto Entry Rapid Shutdown Device (GTC=I pcs)
Press the middle button of GTC to let the Running light always on, let the RSD light go out, after 5 seconds and then long press the button, GTC enters into the automatic recording mode, release the button, the indicator light 234 flashesback and forth waiting for about 10 minutes the Running indicator light flashes to indicate the success of the automatic recording, press the button again to the Running indicator light is always on, the rapid shutdown device is working normally. If the indicator light 3 blinking means that this automatic recording failed please check the line and re-execute the step, if three times are not suc- cessful please contact the relevant technical personnel.
Manual Entry Rapid Shutdown Device (GTC>I pcs)
Opomba: If the automatic entry function is used, it will cause conflicts by duplicating the respective managed rapid shutdown devices in multiple GTCs in the field, axi you cnty need to re-execute the qæration of rnanually . (Manual entry of rapid shutdown devices is for recording the field rapid shutdown devices into different GTCs)
Proces
Priporočen postopek prijave:
- Najprej vklopite GTC.
- Za povezavo GTC in računalnika uporabite kabel USB-RS485.
- Izberite ustrezna serijska vrata
- Preberite MAC naslov in različico. Če je prikaz normalen, to pomeni, da je trenutna povezava normalna, sicer preverite, ali je kabel pravilno priključen.
- Enter the RSDi-2 code into the List list, and then click Write to write it to GTC; there are two ways to enter the code as follows
- Z gumbom Uvozi prepoznajte izbrano sliko za uvoz.
- Številko vnesite ročno s tipkovnico in upoštevajte, da so vse številke ločene z vejico.
- Monitor the current status of the rapid shutdown through To Monitor.
Ožičenje
- Use USB to RS485 to connect the GTC to thecom ter, the connection is shown below:

Opis
- Izberite ustrezna serijska vrata
After success, the green circle is as follows
- Opis funkcij Splošnih trgovinskih ponudb

- OMAC Addr
- Kliknite Preberi, da preberete naslov GTC, in kliknite Zapiši, da vnesete naslov v levo vnosno polje GTC.
- Različica
- Kliknite Preberi, da preberete številko različice programske opreme Splošnih pogojev poslovanja.
- Datum in čas
- Kliknite Preberi, da preberete čas GTC, in kliknite Zapiši, da zapišete sistemski čas v GTC.
- RSDi-2 Config – Import
- Click Import to import the RSDi-2 code through the image, as follows
- Kliknite Uvozi, da uvozite prepoznane kode v polje s seznamom.

- RSDi-2 Config – Read
- Click Read to read the RSDi-2 list of the current GTC configuration.
- RSDi-2 Config – Write
- Click Write to write the RSDi-2 list to GTC.
- RSDi-2 Config – Clear
- Click Clear to delete all the RSDi-2 in GTC.
- RSDi-2 Config – To Monitor
- Click Monitor to display the RSDi-2 in List on the Monitor page.
Read single RSDi-2 working parameters function description

Input the RSDi-2 number you need to read, click Read to read its current status.
- Comm: communication status, Online stands for online, Offline stands for offline.
- State: current state, ON working, OFF closed.
- Temp: trenutna temperatura, stopinje Celzija
- Napaka: trenutna napaka, Normalno pomeni normalno.
- V zv.tage: vnos voltage
- Out Voltage:Izhodna glasnosttage
- Izhodni tok: Izhodni tok
- Izhodna moč: Izhodna moč
- SKU: Model izdelka
- Čas delovanja:Čas delovanja
- Pravočasno: Delovni čas
- Energija: Proizvodnja električne energije
- Čas prejema: Čas prejema
Opis funkcij monitorja

Click Start to start monitoring, the software will refresh the status of RSDi-2 in List regularly.
GTC distribution network (APP2.0 instructions for use)
- 1. korak. Prenesite aplikacijo in registrirajte račun
Skenirajte kodo QR za prenos APP
Odprite aplikacijo za registracijo računa
- 2. korak. Izdelava sončnih elektrarn
Kliknite za ustvarjanje elektrarne
- 3. korak. Izpolnjevanje podatkov o elektrarni
Just fill in the information according to your own power station
- Korak 4. Skeniranje prehoda za zbiranje podatkov
Kliknite spustni meni v zgornjem desnem kotu, kliknite »Dodaj beležnik« in skenirajte QR kodo serijske številke WIFI na levi strani splošnih pogojev za Data Gateway. 
- Korak 5. Distribucijsko omrežje GTC WIFI
Najprej kliknite spustni meni v zgornjem desnem kotu »Čez«view” page, and then click on “Configuring Network”. Operate according to the indicated process. It will be okay as long as the successful network configuration is displayed
- Step 6. Optimizer(RSD) Details
Kliknite spustni meni v zgornjem desnem kotu na »Čez«view« in nato kliknite na »Seznam naprav«- Kliknite na stolpec »Logger«, da odprete stran s podrobnostmi zbiralca
- Kliknite na »Krmilnik optimizatorja« v razdelku »Podrobnosti beležilnika«, da odprete stran »Podrobnosti prehoda optimizatorja«.
- Kliknite na »Pod naprave« in videli boste serijsko številko optimizatorja
- Click on the arrow on the right side of the optimizer serial number to enter the “Optimizer Detail(RSD Detail)” page
- The device information will be displayed on the “Optimizer Detail(RSD Detail)” page

- Kliknite ikono »Zgodovina« na dnu, da view the graphical display of the “Optimizer Detail(RSD Detail)” (showing input voltage, izhodna voltage, temperatura, izhodni tok in izhodna moč)
- Korak 7. Opazovanje stanja elektrarne

- Vrnitev na »Več«view»stran« in si lahko ogledate osnovne informacije o proizvodnji električne energije v elektrarni
- Kliknite na »Zgodovina« na desni strani »Over«view"v aplikaciji in si lahko ogledate največjo moč elektrarne
- Kliknite na »Postavitev« na desni strani »Zgodovina« v aplikaciji in videli boste stanje fotonapetostnih modulov.
- Kliknite na »Prikaži krivulje« in si lahko ogledate krivuljo moči modulov
- Dolgo pritisnite »Graf fotovoltaičnih modulov« in prikazale se bodo podrobne informacije o modulih.
- Step 8: Layout modifications

-
- Kliknite na majhno ikono tukaj, da spremenite postavitev
- Kliknite na majhno ikono tukaj. Prikazala se bo pikčasta mreža za lažjo postavitev.
- Kliknite na »Uredi«
- You can modify the angle of the components. Save it after the modification is completed
- Druge funkcije

-
- Dodajte e-poštni naslov obiskovalca
- Switch perspectives, that of professional consultants and end users All the above steps are operated based on end users
Globalni sedež
SUNGO Energy Technology (Jiangsu) Co., Ltd. Add: 3rd Floor, Building 9-1, Start-up Zone of Yangtze River Delta International R&D Community, No. 286 Qinglonggang Road, High-speed Railway New Town, Xiangcheng District, Suzhou City, Jiangsu Province, China
Evropski sedež
SUNGO Energy Technology B.V. Add: Hoofdweg-Noord 9T, 2913LB Nieuwerkerk aan den IJssel, The Netherlands
Proizvodna baza za optimizacijo in shranjevanje energije
KONKA&SUNGO Smart Energy (Zhejiang) Co., Ltd. Add: Building 3#, Small and Micro Industrial Park, No. 69 Xingmei Avenue, Chengtan Street, Xinchang County, Shaoxing City, Zhejiang Province, China
Sungo Energy UK
Naslov: 60 Windsor Avenue, London SW19 2RR, Združeno kraljestvo
Sungo Energy DE
SUNGO Energietechnik GmbH
Naslov: Berliner Str. 300b, 63065 Offenbach na Majni, Nemčija
Sungo Energy ZDA
SUNGO ENERGY TECHNOLOGY INC.
Naslov: 5900 Balcones Drive, STE 100 Austin TX 78731
Web: www.sungoess.com
E-pošta: prodaja@sungoess.com
Global Headquarters Tel:+86 (O) 512 6512 2036
Evropski sedež Tel: +31 (0)10 307 21 68
SUNGO Energy I-JK Tel:+44 @) 330 122 6559
Poprodajni e-poštni naslov: after-sales@sungoess.com
Sungo reserves all rights. All other trademarks mentioned in this document are trademarks of their respective owners. The information in this document is for reference only and does not constitute any offer or commitment. Sungo may modify the above information without prior notice.

pogosta vprašanja
What is the maximum number of RSDi-2 units that can be connected to one GTC?
One GTC can accommodate up to 50 RSDi-2 units.
Dokumenti / Viri
![]() |
SUNGO Energy Technology RSDi-2 2-in-1 Rapid Shutdown Devices Data Gateway [pdf] Navodila za namestitev RSDi-2, GTC, RSDi-2 2-in-1 Rapid Shutdown Devices Data Gateway, RSDi-2, 2-in-1 Rapid Shutdown Devices Data Gateway, Shutdown Devices Data Gateway, Devices Data Gateway, Data Gateway, Gateway |

